AxisSpec.setGridBetween(Boolean)
Specifies whether grid lines are drawn between tick marks rather than at tick marks. Note: There is no corresponding “getter” function.
Example
Chart Component Script
var spec = new AxisSpec();
spec.setGridBetween(true); (1)
| 1 | Draw grid lines between tick marks. |
Script that modifies the graph or dataset properties should be placed on the Chart component itself. See Add Component Script for more information. This script has access to the Chart data and Chart API methods. Scripted Charts are not good candidates for user-modification, so you should deselect ‘Enable Ad Hoc Editing’ in the Chart Properties dialog box.
|
|
To change the property on a Chart that was previously created with the Chart Editor, use EGraph.getCoordinate() ①, RectCoord.getYScale() ②, and Scale.getAxisSpec() ③ to obtain a handle to the desired Coordinate object, Scale object, and so on. For example:
|